Sunday, 4 August 2013

Year of Projects 3: August 4th update


I've actually managed a fair bit of progress this week! Mostly, I've been a monogamous knitter, working solely on my Wingspan.


I've completed two whole triangles and started a third! I made sure to weigh my yarn after the first triangle, so I know it takes roughly 10g of this yarn on these needles. That means I might be able to squeeze an additional triangle out of it and make the shawl a bit bigger.

I have discovered something though, When I cast on for the second triangle, I used a cable cast on and then just knit normally into the stitches. It's left me with quite a loose cast on edge for those stitches. With triangle number three, I used the same cast on, but knit into the back loop for the new stitches, which has left me with a much neater, tighter edge.


I will do the rest of the triangles the same way, and leave the loose edge as a "design feature". I doubt anyone apart from me will notice it anyway, once I'm wearing it!

Yesterday, I also picked up Dragonfly Wings again, dug out my 5mm needles and started the lace border. So far, I've knit two row of it! I appeared to be one stitch out, so I have fudged it a little near the centre and I'm sure it won't make a difference when I'm done. Another "design feature"!

In other good news, while tidying the house for a visit from the in-laws yesterday, I found my missing DPN in the sofa. Which means work can start again on my socks.

Not likely to get much knitting done this week though, as I have a lot of studying to do before I go away for a course on the 12th. I think Wingspan and the socks will make very good projects to take with me to keep me entertained each evening when I'm sat in my hotel room all by myself!
Related Posts Plugin for WordPress, Blogger...