Showing posts with label yop14/15. Show all posts
Showing posts with label yop14/15. Show all posts

Sunday, 5 April 2015

Year of Projects 4: 5th April update


The house move is almost over! Having a large crossover in occupancy between our two houses has been quite useful, but I think a month was too long, as we still haven't handed the keys back on the old place. Almost feels like we can't get started on living here properly until we've given the old house back! We've got the cleaners in today (on Easter Sunday! We were amazed) and one more trip to the tip to get rid of the last few bits and pieces. But then we are done.

Some of you may have seen this before, if you follow me on Instagram (@supertinks). But I wanted to share it again because quite frankly, I think it's gorgeous. Check out my front door!


It's just as lovely from the inside as well, when the light hits it in the mornings.


It makes me smile every time I come home, which has to be a good thing. Even if I've had a terrible day at work, or if I've been soaked by rain walking home from the station, I get to my front door and it cheers me up.

My new craft/sitting room is coming on nicely. It is finally clear of all the random stuff that doesn't belong in it, so I can share some pictures at last.





I have deliberately left the wall above the sofa bare of pictures for now, as I intend to finish my Doctor Who cross stitch patterns and get them framed, and then they will hang along that wall in lovely matching frames.

It is so nice to finally have all of my crafting things in the same place. I've sort of arranged everything on the shelves for now, but need to go through each shelf one by one and work out a proper way to store everything on it, so that I can see what is there and access it easily.

We are planning a trip to Ikea next week, so will hopefully be able to pick up a variety of useful boxes and baskets then. I may also look at getting a sewing table to put in the bay window, but that is not a priority necessarily as the dining table is in the room next door.

I doubt I'll get much done to progress my list over the next few weeks, as I will be focusing on making things to improve the storage and aesthetic of my room. I am also already casting my mind forward and thinking about a different way to approach the fifth year of projects, which is now only three months away!


Sunday, 15 March 2015

Year of Projects 4: 15th March update


Not much of an update from me at the moment as we are in full on house moving mode and everything has been packed away! We are moving on Thursday this week, so every spare second I have is being used to pack and tidy and throw things away.

I have kept one of my projects unpacked, however, as on Wednesday evening we will be taking the cat over to the new house, and will have an evening without TV, Internet or packing to keep us entertained. I figured Pogona was portable enough that I could keep it out and entertain myself with it once the cat is settled in for the night.

One thing I have noticed while sorting the house for the move is that my craft supplies have expanded somewhat since we moved in two years ago. They're taking up a lot more boxes than last time! Luckily, in the new house I get to have a whole room all to myself, for keeping all of my craft supplies in one place. It will have a sofa, and has a working fireplace, so will be nice and cosy. Will share pics once I am moved in and unpacked!

Tuesday, 24 February 2015

Year of Projects 4: 24 February update


I wasn't sure I was going to be able to rustle up another FO for this week's update, especially after the success of a pair of socks in a week last week. With the socks off the needles, the only YoP projects I had on the go were all long term affairs. Pogona is progressing well, but hasn't changed enough to be worthy of having more photos taken. My test knit of my Star Trek charts for my nerdy sofa cushions hasn't got to an interesting stage yet, consisting mostly of a large rectangle of black stocking stitch, so there's no pictures of that either. And Chunari is still hibernating, although I did briefly get it out and look at it the other day. I really do need to be in the right mood for laceweight knitting!

The other night, however, I decided to cast on something else from my queue, something which would hopefully be a nice quick knit. The Jayne Cobb hat. Unfortunately, I didn't have a circular needle of the right length, so I had to cast on with DPNs, which made for a very awkward knitting process and rather slow progress.

However, I went to Unravel at the weekend (where I spent a lovely couple of hours wandering about the place with Sarah from Crafts from the Cwtch and Wink of A Creative Being). I only made a few purchases (which completely blew my budget out of the water).


Among all the yarn pretties, you will have noticed a new cable for my interchangeable needles. I now have a 16" cable, which means knitting hats of any size just became a whole lot easier! As soon as I got home, I fixed up the cable with my 7mm needles, and transferred the stitches across. Needless to say, the hat got knit a whole lot quicker after that!

More on the hat in a moment while I digress slightly to talk about the yarns I purchased. Despite not having yet knit a single stitch on the three Easyknits skeins I already own, I picked up two more. The first was definitely on my list of things to buy, a sushi sock roll to knit Jon's Orbit shawl with. I bought the pattern at Unravel last year, and have been holding off knitting it until I had the perfect gradiated skein of yarn to use. I spent a long time debating colours, but settled on Killer Queen, which is a gorgeous combination of electric blue, purple and pink. Of course, I spent so long at Jon's stand that I couldn't help myself, and another skein of Deeply Wicked sort of fell into my hands as well. Another electric blue, as I've grown fond of the colour since knitting my Arctic socks last week!

The third skein I picked up is something I've been wanting to get my hands on for a while. Indigodragonfly yarns have been on my want list for many years, and it's all Keri's fault. I've been reading about all the indigodragonfly yarns she uses for years, and long lamented its lack of availability in this country. But at Unravel last year I discovered that Aragon Yarns are the only UK stockist of this gorgeous yarn, so when I saw their name on the exhibitor list again this year I decided I was definitely going to walk away from the show with something. Not only is the yarn gorgeously soft (it's merino/cashmere/nylon - way too nice for socks if you ask me, I shall be using it for a shawl) and dyed in fantastic colours, it's the names of the colourways which really makes this yarn stand out. Each colour is named after a fabulously geeky quote. The colour I chose is My name is Indigo Montoya, which is a play on words on a quote from The Princess Bride. I'm not adding any of these yarns to my list this year, but I guarantee you that when July rolls around this year, this skein will be top of my list!

Anyhoo, back to my FO for the week. Once I'd switched to the circulars, I flew through the rest of the hat and finished it on Sunday morning.


I made a few modifications to the pattern as written, because I was working with a chunkier yarn and Jamie has a big head. I cast on 64 stitches, did 2x2 rib instead of 1x1 (mainly because I hate doing 1x1), and made the whole thing longer. It's got about 4 inches of orange after the inch of rib, and then 4 inches of yellow before the very sharp decreases. I also added a couple of rows of icord on the ear flaps before casting off.

Jamie claimed it didn't need a pom pom, but I wanted to stay true to the original hat as seen in Firefly. So he got a red and orange pom pom, but it's not particularly bulky. I'm pleased with the finished hat, and he loves it too. And more importantly, I can cross another FO off my list!

Monday, 16 February 2015

Year of Projects 4: 16th February update


A day late with an update this week, but I couldn't not stop by and share my sock progress! Last week I shared a photo of my red and white stripey socks, and I am pleased to report that I actually finished them later on that day.


Buoyed by my socky success, I immediately wound another skein of sock yarn and cast on another pair of socks. This time using a skein of Candy Skein yarn I bought back in January 2012. It's the sock club colourway from that month, Arctic Mint. If memory serves, this was one of the earliest sock club colours that Tami did.


I took the above picture yesterday morning, in preparation for writing a post then about how amazed I was that I'd knit a sock and a half in a week. However, the rugby kicked off before I managed to get the photos onto the computer, and by the time the game was over...


I knit a pair of socks in a week! I'm so pleased with myself. The pattern is Bandwagon Socks by Phreadde Davis, which is more of a recipe for the socks than a pattern per se, as most of the elements for the pattern come from other patterns. So I didn't feel so bad about making my own modifications.

First up, I have tried and failed on numerous occasions to get to grips with Judy's magic cast on, and therefore replaced the toe with my now standard short row toe. Second, I looked at the instructions in the pattern for the toe up gusseted heel, but didn't feel confident enough about them to try to follow them. So I stuck with what I know, and substituted a short row heel as well.

The rest then became second nature, as I know exactly how many rows I need to knit for the foot to fit me, when I've got fingering weight yarn, 2.5mm needles and have cast on for 64 stitches! The only other modification I made was to adjust where in the chart I started when I got to the second sock, as I wanted them to be matching. So I started the chart halfway through on foot 2, so that when I wore the socks the zig zag of the yarn overs would be mirror opposites.


I'm incredibly pleased with these socks, and the surprising realisation that it was actually quicker to knit patterned socks than it was to knit plain ones! I plan to wear them to Unravel on Saturday, if I make it.

Sunday, 8 February 2015

Year of Projects 4: 8th February update


Another month has passed, and I have singularly failed to update on my progress. There has been progress, but I've also been fairly busy and haven't had time to do things like take decent photos, or sit down and write a post. I'm hopeful this will change going forward, as I have a new laptop which will make writing posts a lot less of a hassle, and I've just found this tutorial on Pinterest for making a light box, which will make taking photos in the dark winter evenings a lot easier. I even have a cardboard box lying around in my kitchen which will be perfect for it!

There is one thing which may interrupt a regular posting schedule again, though, as we were told last week that our landlords want to sell the house, so we are being forced to move house again. We have to be out by 8th April, so I may be a little distracted over the next few months. Luckily, the two main projects I have on the go right now don't require a lot of concentration, and can easily be picked up and put down again after only having worked a few stitches here and there.


My stripey socks are coming along well. While it has taken me longer than my target ten days to finish, that's mostly down to the fact that I put them away and then ignored them for a couple of weeks! Since taking this photo yesterday I have finished the foot, turned the heel and made a solid start on the ankle. I'm about 40 rows away from the cuff, which means about 50 rows from completion. There's probably enough yarn left in the ball to make a second pair, but I have other plans for it. Plans which involve food colouring!


Last time I updated I said Pogona would probably be the next shawl I cast on, and it turns out I was right. I started this earlier this week, as a way of soothing myself following the bad news about the house. I'm using Wollmeise Twin in Mouseballet, but it's a We're Different skein so the colours aren't perfect. The colours are striping and pooling in odd ways, as the colour changes are so short, and I'm interested to see how it looks once the shawl gets bigger. So far, I'm enjoying this pattern as it's so simple. Now I've done my final set of marker placements, all I have to do is knit the same two rows over and over again until it's big enough. And since I have a whole 150g of yarn to play with, it might end up a bit bigger than it's supposed to!

As I'm likely to finish the socks this week, I've already thought about what I want to cast on next - the Bandwagon Socks that have been sat at the top of my Ravelry queue for quite a while now. If I get through those as quickly as the plain socks then I think I'll be on track for finishing at least 4 pairs of socks in this Year of Projects.

Sunday, 11 January 2015

Year of Projects 4: 11 January update


It's been a while since I updated on my progress of my fourth Year of Projects (in fact, I haven't updated at all since I posted my list and first post back in July... ooops!). While I've been pretty busy over the summer/autumn, and haven't had much time to blog, I have been working on things and making some progress towards my goals.

Firstly, the outstanding WIPs that needed finishing. I still haven't got around to blocking Peerie Flooers, which is quite frankly becoming embarrassing. It has now been two years since this hat came off my needles. Two years! I simply must get round to it soon - I don't want to be carrying this forward to the fifth Year of Projects in July.

Chunari is currently hibernating. With no firm due date in mind, and no real idea as to when I will ever wear it once it is finished, there really is no incentive to get it finished. Which is something of a shame, as I am sure it will be stunning once completed.



However, I do have one completed WIP from last year's list! My Knotty Gloves were started in February 2014, and I knit all but the thumb of the first glove before losing interest and moving on to something else. At Christmas, I was inspired to pick them back up again (the influence of one of my knitterly friends, who was staying with us over the holiday) and in less than two days I finished off the first glove, and successfully completed the second!


The yarn is Knit Picks Palette in Serrano, and I used less than one ball. If I'd been paying more attention, I would have reversed the cables on the second glove so they were a matching pair. As it was, I had to rip them back and start over due to not paying enough attention, so I think if I'd been trying to reverse the chart as well I would have made a lot more mistakes!

There were a lot of socks and shawls on my list this year, probably more than I will now have time to finish, since we are less than six months away from the end of this challenge and we are only a few months away from a new LARP season! So far, though, I have managed to complete one shawl, and a hat (which replaces one of the shawls on the list), and have started on the first pair of socks!


Andalusia is another fabulous shawl from the wonderful Mimi Codd. After knitting Mrs Tumnus in 2013 I knew I would enjoy knitting another of Mimi's horseshoe shaped shawls. I used Zauberball for this one, in a rather vibrant pink colourway. Frustratingly, I ran out of yarn about four rows from the end, and had to order another ball. So instead of using up a ball from my stash, this shawl has actually had zero impact on the amount of yarn left on the shelves!


I had originally put the Spring Leaves scarf on my list with plans to use my Madeleinetosh Tosh Merino Light. However, the colouring in this yarn really doesn't match up well with lace patterns, and is much better suited to plain stocking stitch. So out went the scarf idea, and in came the Sockhead Hat. I've seen several of my knitting friends make this hat before, so I knew it would be a winner. The colours look amazing and it's incredibly warm for such a light yarn. I haven't blocked it, as I don't think it needs it. It is the perfect pattern for mindless knitting. No need to count rows or stitches till you get to the decreases; just row after row of effortless stocking stitch in the round. Perfect for knitting during a James Bond film marathon!


Starting on the endless list of socks (I think there are at least five pairs on the list!), I have opted for simple vanilla socks in this striking England colourway from Regia. I have plain white which I am using for the toes and heels, so the stripes stay consistent, as this is something I didn't do with my knee high socks and I don't like the way self-striping yarn goes a bit funny over the short row heel. So far, I am making good progress, as I only cast on yesterday and am already almost at the heel. The first time I made Wendy's Generic Toe Up Socks it took me ten days, so I'm hoping to knock these out in the next couple of weeks.

I'm fairly sure that unless something drastic changes, I will focus on the things on my list where a yarn and pattern have already been assigned. So socks, and probably one other shawl. I'm leaning towards Pogona at the moment, as a nice excuse to knit with Wollmeise again.

With respect to the nerdy section of my list, I have made relatively good progress there too. Of the four Doctor Who themed cross stitch charts I designed, two are now completed and just waiting for frames.



I've also finished the third of the Game of Thrones charts and am now deciding which one to tackle next. Something with a less complicated chart, I think, as this lion was tricky.


Finally, I got around to designing the chart for my Star Trek cushions, and started knitting the first one the other day. There is endless black stocking stitch to go before I get to the interesting bit though, so no progress pics of this one until it gets to the good stuff!

I was worried that I would come to review my progress so far and find I had done nothing at all, but considering everything else I've been up to, I don't think my progress is too disappointing. I just need to keep up the momentum now I've regained some of my urge to knit, and hopefully will have more to update with in the coming weeks.

Sunday, 6 July 2014

Happy New Year!!


It's finally here! The new Year of Projects officially started on 1 July! Lists are popping up all over the place, and everyone is very excited to get started. All the details can be found on our Ravelry Group.

I've written and re-written my list a number of times this year, but have finally settled on a mixed approach, combining a number of different ideas into one list. Finishing WIPs, working from my Ravelry queue, using up stash and continuing work on my long term design project. My full list can be found on my Year of Projects 4 page. 23 different projects this year, which given I had a finishing total of 19 last year doesn't sound unreasonable. There's a nice mix of projects, from socks to shawls to household decor. Some will be fairly quick knits, while others may take a bit longer.

I'm not actually starting work on the list yet, as I am right in the middle of LARP season and busy sewing things for that, which I will share after the event (as they are sort of a surprise for people and I don't want to spoil that). Which means there probably wont be an update next Sunday as I will still be in a field!

In the mean time though, head on over to the group, and check out everyone else's lists!
Related Posts Plugin for WordPress, Blogger...